Closures and Impacts
Here are the current planned, non-emergency traffic, trail, utility, and park closures and impacts throughout the Township of Langley. All work is weather dependent and may be rescheduled or extended as required. To stay up to date on the latest impacts, including unplanned and emergency closures and impacts, check this page regularly and follow @langleytownship on X (Twitter).
Utility service maintenance: East Langley, January 19 to 23
Metro Vancouver will be conducting planned maintenance at the Jericho reservoir which services East Langley (Aldergrove, Gloucester, Salmon River and Tall Timber) from January 19 to 23. We don’t expect this work to impact water service to this area but if you do encounter an interruption to your water, please contact the Township's Engineering and Public Works Division at 604-533-6006.
Monday, January 19 to Sunday, January 25
Traffic impact: 80 Avenue between 202A Street and 206A Street, January 19 to February 28
Utility work on 80 Avenue between 202A Street and 206A Street will result in single lane alternating traffic from 9am to 2:30pm, Monday to Friday on January 19 to February 28. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 65 Avenue between 20300 Block to 20400 Block, January 20
Surveying work on Fraser Highway between 20300 Block to 20400 Block is scheduled for January 20 and will result in single lane alternating traffic on Tuesday, 8am to 12pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Fraser Highway between 216 Street and 222 Street and 221 Street between Fraser Highway and 49 Avenue, January 19 to 30.
Utility work on Fraser Highway between 216 Street and 222 Street will cause traffic delays Monday to Friday from 9am to 2pm. Additionally, utility work on 221 Street between Fraser Highway and 49 Avenue may result in delays Monday to Friday from 9am to 3pm. Traffic control personnel will be on site.
Traffic impact: 208 Street between 20 Avenue and 24 Avenue, January 19 to 30
Utility work on 208 Street between 20 Avenue to 24 Avenue is scheduled for January 19 to 30 and will result in single lane alternating traffic from Monday to Friday, 9:00am to 2:30pm. Traffic control personnel will be on site and delays may be experienced.
Monday, January 12 to Sunday, January 18
Road closure: Fraser Highway between 248 Street and 36 Avenue, January 15 and 16
Fraser Highway between 248 Street and 36 Avenue is scheduled to close to traffic beginning 10pm to 5am on January 15 and 16. The closure will be in effect during these hours. A detour route will be in effect and indicated by signage.
Traffic impact: 202A Street between 74B Avenue and 76 Avenue, January 16 to 23
Utility work on 202A Street between 74B Avenue and 76 Avenue will result in single lane alternating traffic from 9am to 2:30pm Monday to Friday on January 16 to 23. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to March 30
Maintenance work on 272 Street between 28A Avenue and 29 Avenue will result in single lane alternating traffic from 9am to 5pm, Monday to Friday on January 16 to March 30. Traffic control personnel will be on site and delays may be experienced.
The work is weather dependent and may be rescheduled or extended as required. Road closure: 76 Avenue between 207 Street and 208 Street on January 13 and 76 Avenue between 208 Street and 209 Street on January 15
76 Avenue between 207 Street and 208 Street will be closed to traffic on January 13, and 76 Avenue between 208 Street and 209 Street will be closed on January 15. Both closures will be in effect from 7am to 5pm.
Detour routes will be in effect and indicated by signage.
Traffic impact: Glover Road between Billy Brown Road and McBride Street and Mavis Avenue between McBride Street and Glover Road, January 13
Utility work on Glover Road between Billy Brown Road and McBride Street and Mavis Avenue between McBride Street and Glover Road will result in single lane alternating traffic from 7am to 5pm on January 13. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Fraser Highway between 27100 Block and 27300 Block, extended to March 27
Utility work on Fraser Highway between 27100 Block and 27300 Block has been extended to March 27 and will result in single lane alternating traffic from 9am to 2:30pm. Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic from 9am to 2:30pm.
Night work is scheduled for January 12 and 13 at the intersection of Fraser Highway and 272 Street, occurring between 10pm and 5am. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 272 Street between 36A Cresent to 48 Avenue, January 12 to 20
Utility work on 272 Street between 36A Cresent to 48 Avenue is scheduled for January 12, 2026 to January 20, 2026 and will result in single lane alternating traffic from Monday to Friday, 7am to 5pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Fraser Highway between 228 Steet to 232 Steet, January 12 to 16
Utility work on Fraser Highway between 228 Steet to 232 Steet is scheduled for January 12 to 16 and will result in single lane alternating traffic from Monday to Friday, 9am to 2pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 232 Street between 46 Avenue and 48 Avenue, January 12 to 16
Communications work on 232 Street between 46 Avenue and 48 Avenue will result in single lane alternating traffic from 9am to 3pm, Monday to Friday on January 12 to 16. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 200 Street between 18 Avenue and 22 Avenue, January 12 to 31
Utility work on 200 Street between 18 Avenue and 22 Avenue will result in single lane alternating traffic from 9am to 3pm, Monday to Friday, on January 12 to 31. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 272 Street between 29 Avenue to Fraser Highway, January 12 to 15
Utility work on 272 Street between 29 Avenue to Fraser Highway is scheduled for January 12 to 15 and will result in single lane alternating traffic from Monday to Friday, 9am to 3pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 232 Street between 46 Avenue to 48 Avenue, January 12 to 16
Utility work on 232 Street between 46 Avenue to 48 Avenue is scheduled for January 12 to 16 and will result in single lane alternating traffic from Monday to Friday, 9am to 3pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 216 Street between 48A Avenue to 49A Avenue, January 12 to 16
Utility work on 216 Street between 48A Avenue to 49A Avenue is scheduled for January 12 to 16 and will result in single lane alternating traffic from Monday to Friday, 9am to 2pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 200 Street between 12 Avenue and 16 Avenue, January 12 to 16
Utility work on 200 Street between 12 Avenue and 16 Avenue is scheduled for January 12 to 16 and will result in single lane alternating traffic from 7am to 5pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 64 Avenue between 226 Street and 228 Street, January 12 to 16
Utility work on 64 Avenue between 226 Street and 228 Street is scheduled for January 12 to 16 and will result in single lane alternating traffic from 7am to 8pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 201 Street between 102B Avenue and 100A Avenue, extended to February 13
Maintenance work on 201 Street between 102B Avenue and 100A Avenue has been extended to February 13 and will result in single lane alternating traffic from 7am to 8pm Monday to Friday. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 232 Street between 5700 Block and 64 Avenue, extended to January 30
Telecommunications work on 232 Street between 5700 Block and 64 Avenue has been extended to January 30 and will result in single lane alternating traffic from 9am to 2pm, Monday to Friday. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Glover Road between Telegraph Trail and University Drive, January 9 to March 31
Construction work on Glover Road between Telegraph Trail and University Drive is scheduled for January 9 to March 31 and will result in single lane alternating traffic from 7am to 7pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 88 Avenue between 22800 Block and Wright Street, January 8 to January 19
Utility work on 88 Avenue between 22800 Block and Wright Street is scheduled for January 8 to January 19 and will result in single lane alternating traffic from 9am to 3pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 216 Street between 58 Avenue and 61 Ave, January 5 to 16
FortisBC Gas work on 216 Street between 58 Avenue and 61 Avenue will result in single lane alternating traffic from 9am to 2pm, Monday to Friday, on January 5 to 16. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Fraser Highway between 23000 Block and 240 Street, January 2 to 15
Utility work on Fraser Highway between 23000 Block and 240 Street is scheduled for January 2 to 15 and will result in single lane alternating traffic from 9am to 2pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Fraser Highway between 23500 Block to 23700 Block, January 2 to 15
Utility work on Fraser Highway between 23500 Block to 23700 Block is scheduled for January 2 to 15 and will result in single lane alternating traffic from Monday to Saturday, 9am to 2pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 201 Street between 102B Avenue and 100A Avenue, December 22 to January 31
Maintenance work on 201 Street between 102B Avenue and 100A Avenue will result in single lane alternating traffic from 7am to 8pm, Monday to Friday, on December 22 to January 31. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Fraser Highway between 27100 Block and 27300 Block, December 15 to March 27
Utility work on Fraser Highway between 27100 Block and 27300 Block is scheduled for December 15 to March 27 and will result in single lane alternating traffic from 9:00am to 2:30pm.
Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic from 9:00am to 2:30pm.
Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to January 16
Maintenance work on 272 Street between 28A Avenue and 29 Avenue will result in single lane alternating traffic from 9am to 5pm, Monday to Friday on December 15 to January 16. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 86 Avenue between 200 Street and 202B Street, December 1 to Fall 2026
86 Avenue Road Improvements between 200 Street and 202B Street is scheduled to start on Dec 1 resulting in single lane alternating traffic from 9am to 3pm, Monday to Friday. This work will include widening to four lanes, left turn lanes, new traffic signals at 201 Street and 202 Street, raised medians, bike lanes and/or multi-use pathways, boulevard landscaping, street lights, water mains, and a culvert extension. Work is scheduled to be complete Fall 2026 subject to delays related to weather, permitting or third party installations. We thank you in advance for your patience as we construct this project which will help alleviate traffic congestion in this area.
Temporary road closure: 205 Street between 32 Avenue and 36 Avenue, December 1 to January 16
Construction work on 205 Street between 32 Avenue and 36 Avenue will result in a road closure from December 1 to January 16. Detour routes will be in effect. View detour map.
Traffic impact: 88 Avenue between 19600 Block and 200 Street, Extended to April 17
Utility work on 88 Avenue between 19600 Block and 200 Street has been extended until April 17. This work will result in single lane alternating traffic from 9am to 3pm, Monday through Friday. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13
Utility work on 248 Street between 48 Avenue and 50 Avenue will result in single lane alternating traffic from Monday to Friday, 8am to 5pm, on November 6 to February 13. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31
Utility work on 205 Street between 32 Avenue and 36 Avenue will result in single lane alternating traffic from 7am to 5pm, Monday to Friday, on October 27 to January 31. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice
Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane.
Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30
Construction work on 203 Street between 66 Avenue and 67 Avenue and work on 66 Avenue between 203 Street and 205 Street, will result in single lane alternating traffic from 7am to 30pm until January 30. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31
Utility work on 80 Avenue between 204 Street and 212 Street will result in single lane alternating traffic from 9am to 2:30pm on September 16 to January 31. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30
Road work on 80 Avenue between 192 Street and 197 Street will result in single lane alternating traffic from 7am to 5pm on September 15 to January 30. Traffic control personnel will be on site and delays may be experienced.
Monday, January 5 to Sunday, January 11
Traffic impact: 201 Street between 102B Avenue and 100A Avenue, extended to February 13
Maintenance work on 201 Street between 102B Avenue and 100A Avenue has been extended to February 13 and will result in single lane alternating traffic from 7am to 8pm Monday to Friday. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 232 Street between 5700 Block and 64 Avenue, extended to January 30
Telecommunications work on 232 Street between 5700 Block and 64 Avenue has been extended to January 30 and will result in single lane alternating traffic from 9am to 2pm, Monday to Friday. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Glover Road between Telegraph Trail and University Drive, January 9 to March 31
Construction work on Glover Road between Telegraph Trail and University Drive is scheduled for January 9 to March 31 and will result in single lane alternating traffic from 7am to 7pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 88 Avenue between 22800 Block and Wright Street, January 8 to January 19
Utility work on 88 Avenue between 22800 Block and Wright Street is scheduled for January 8 to January 19 and will result in single lane alternating traffic from 9am to 3pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 256 Street between 24 Avenue and 32 Avenue, January 5 to January 9
Utility work on 256 Street between 24 Avenue and 32 Avenue will result in single lane alternating traffic from 7am to 7pm, Monday to Friday, January 5 to January 9. raffic control personnel will be on site and delays may be experienced.
Traffic impact: 216 Street between 58 Avenue and 61 Ave, January 5 to 16
FortisBC Gas work on 216 Street between 58 Avenue and 61 Avenue will result in single lane alternating traffic from 9am to 2pm, Monday to Friday, on January 5 to 16. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Fraser Highway between 23000 Block and 240 Street, January 2 to 15
Utility work on Fraser Highway between 23000 Block and 240 Street is scheduled for January 2 to 15 and will result in single lane alternating traffic from 9am to 2pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Fraser Highway between 23500 Block to 23700 Block, January 2 to 15
Utility work on Fraser Highway between 23500 Block to 23700 Block is scheduled for January 2 to 15 and will result in single lane alternating traffic from Monday to Saturday, 9am to 2pm. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 201 Street between 102B Avenue and 100A Avenue, December 22 to January 31
Maintenance work on 201 Street between 102B Avenue and 100A Avenue will result in single lane alternating traffic from 7am to 8pm, Monday to Friday, on December 22 to January 31. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 200 Street between 24 Avenue and 27 Avenue, December 19 to January 9
Maintenance work on 200 Street between 24 Avenue and 27 Avenue will result in single lane alternating traffic from 9am to 3pm Monday to Friday on December 19 to January 9. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Fraser Highway between 27100 Block and 27300 Block, December 15 to March 27
Utility work on Fraser Highway between 27100 Block and 27300 Block is scheduled for December 15 to March 27 and will result in single lane alternating traffic from 9:00am to 2:30pm.
Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic from 9:00am to 2:30pm.
Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to January 16
Maintenance work on 272 Street between 28A Avenue and 29 Avenue will result in single lane alternating traffic from 9am to 5pm, Monday to Friday on December 15 to January 16. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 86 Avenue between 200 Street and 202B Street, December 1 to Fall 2026
86 Avenue Road Improvements between 200 Street and 202B Street is scheduled to start on Dec 1 resulting in single lane alternating traffic from 9am to 3pm, Monday to Friday. This work will include widening to four lanes, left turn lanes, new traffic signals at 201 Street and 202 Street, raised medians, bike lanes and/or multi-use pathways, boulevard landscaping, street lights, water mains, and a culvert extension. Work is scheduled to be complete Fall 2026 subject to delays related to weather, permitting or third party installations. We thank you in advance for your patience as we construct this project which will help alleviate traffic congestion in this area.
Temporary road closure: 205 Street between 32 Avenue and 36 Avenue, December 1 to January 16
Construction work on 205 Street between 32 Avenue and 36 Avenue will result in a road closure from December 1 to January 16. Detour routes will be in effect. View detour map.
Traffic impact: 88 Avenue between 19600 Block and 200 Street, Extended to April 17
Utility work on 88 Avenue between 19600 Block and 200 Street has been extended until April 17. This work will result in single lane alternating traffic from 9am to 3pm, Monday through Friday. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13
Utility work on 248 Street between 48 Avenue and 50 Avenue will result in single lane alternating traffic from Monday to Friday, 8am to 5pm, on November 6 to February 13. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31
Utility work on 205 Street between 32 Avenue and 36 Avenue will result in single lane alternating traffic from 7am to 5pm, Monday to Friday, on October 27 to January 31. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice
Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane.
Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30
Construction work on 203 Street between 66 Avenue and 67 Avenue and work on 66 Avenue between 203 Street and 205 Street, will result in single lane alternating traffic from 7am to 30pm until January 30. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31
Utility work on 80 Avenue between 204 Street and 212 Street will result in single lane alternating traffic from 9am to 2:30pm on September 16 to January 31. Traffic control personnel will be on site and delays may be experienced.
Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30
Road work on 80 Avenue between 192 Street and 197 Street will result in single lane alternating traffic from 7am to 5pm on September 15 to January 30. Traffic control personnel will be on site and delays may be experienced.
| Closures and Impacts - December 2025 |
Monday, December 29 to Sunday, January 4Traffic impact: Fraser Highway between 23000 Block and 240 Street, January 2 to 15 Traffic impact: Fraser Highway between 24300 Block to 24500 Block, December 29 to January 2 Traffic impact: Fraser Highway between 23500 Block to 23700 Block, January 2 to 15 Traffic impact: 201 Street between 102B Avenue and 100A Avenue, December 22 to January 31 Traffic impact: 200 Street between 33A Avenue and 35 Avenue, December 28 to January 4 Traffic impact: 264 Street between 72 Avenue and 76 Avenue, December 19 to December 30 Traffic impact: 272 Street between 23 Avenue and 24 Avenue, December 19 to December 30 Traffic impact: 200 Street between 24 Avenue and 27 Avenue, December 19 to January 9 Traffic impact: Fraser Highway between 27100 Block and 27300 Block, December 15 to March 27 Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic from 9:00am to 2:30pm. Traffic control personnel will be on site and delays may be experienced. Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to January 16 Traffic impact: 86 Avenue between 200 Street and 202B Street, December 1 to Fall 2026 Temporary road closure: 205 Street between 32 Avenue and 36 Avenue, December 1 to January 16 Traffic impact: 88 Avenue between 19600 Block and 200 Street, Extended to April 17 Traffic impact: 88 Ave between 204 Street and 205 Street, November 11 to December 31 Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, November 6 to December 31 Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane. Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30
Monday, December 22 to Sunday, December 28Traffic impact: 216 Street between 4500 Block and 46 Avenue, December 22 to 26 Traffic impact: 201 Street between 102B Avenue and 100A Avenue, December 22 to January 31 Traffic impact: 16 Avenue between 21100 Block and 232 Street, December 22 to December 26 Traffic impact: 202A Street between 74B Avenue and 76 Avenue, December 22 to December 24 Traffic impact: 200 Street between 33A Avenue and 35 Avenue, December 28 to January 4 Traffic impact: 200 Street between 38A Avenue to 40 Avenue, December 22 to 23 Traffic impact: 56 Avenue between 224 Street and 22000 Block, December 22 to 23 Traffic impact: 272 Street between 27B Avenue and 28 Avenue, December 19 to December 23 Traffic impact: 264 Street between 72 Avenue and 76 Avenue, December 19 to December 30 Traffic impact: 272 Street between 23 Avenue and 24 Avenue, December 19 to December 30 Traffic impact: 200 Street between 24 Avenue and 27 Avenue, December 19 to January 9 Traffic impact: Glover Road between 88 Avenue and St. Andrews Avenue, December 19 to December 23 Traffic impact: 96 Avenue between Glover Road and Edal Street, December 19 to December 26 Traffic impact: Fraser Highway between 24066 Block and 24216 Block, December 19 to 26 Traffic impact: 216 Street between 78 Avenue and University Drive, December 19 to 26 Traffic impact: 216 Street between 40 Avenue and 3800 Block, December 18 to 24 Traffic impact: 16 Avenue between 236 Street and 240 Street, December 19 to 26. Traffic impact: Traffic Impact: Glover Road between Francis Avenue and 96 Avenue, December 18 to 24 Traffic impact: 88 Avenue between Nash Street and Glover Road, December 17 to 23 Traffic Impact: 56 Avenue between Langley Bypass and 211 Street, extended to December 15 to 24 Traffic impact: Fraser Highway between 27100 Block and 27300 Block, December 15 to March 27 Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic from 9:00am to 2:30pm. Traffic control personnel will be on site and delays may be experienced. Temporary Road Closure: 83 Avenue between 198 Street and 200 Street, December 15 to December 24 Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to January 16 Traffic impact: 232 Street between 5700 Block and 64 Avenue, December 5 to 23 Trail closure: Yorkson Creek Trail between 206 Street and 208 Street, extended to December 23 Traffic impact: 86 Avenue between 200 Street and 202B Street, December 1 to Fall 2026 Temporary road closure: 205 Street between 32 Avenue and 36 Avenue, December 1 to January 16 Traffic impact: 88 Avenue between 19600 Block and 200 Street, Extended to April 17 Traffic Impact: 232 Street between 7900 Block and Rawlison Crescent, November 28 to December 22 Traffic impact: 88 Ave between 204 Street and 205 Street, November 11 to December 31 Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, November 6 to December 31 Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane. Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Monday, December 15 to Sunday, December 21Traffic impact: 272 Street between 27B Avenue and 28 Avenue, December 19 to December 23 Traffic impact: 264 Street between 72 Avenue and 76 Avenue, December 19 to December 30 Traffic impact: 272 Street between 23 Avenue and 24 Avenue, December 19 to December 30 Traffic impact: 200 Street between 24 Avenue and 27 Avenue, December 19 to January 9 Traffic impact: Glover Road between 88 Avenue and St. Andrews Avenue, December 19 to December 23 Traffic impact: 96 Avenue between Glover Road and Edal Street, December 19 to December 26 Traffic impact: Fraser Highway between 24066 Block and 24216 Block, December 19 to 26 Traffic impact: 216 Street between 78 Avenue and University Drive, December 19 to 26 Traffic impact: 216 Street between 40 Avenue and 3800 Block, December 18 to 24 Traffic impact: 200 Street between 24 Avenue and 2550 Block, December 18 to 19. Traffic impact: 16 Avenue between 236 Street and 240 Street, December 19 to 26. Traffic impact: Traffic Impact: 208 Street between 37A Avenue and 38A Avenue, December 18 to 19 Traffic impact: Traffic Impact: Glover Road between Francis Avenue and 96 Avenue, December 18 to 24 Traffic impact: 88 Avenue between Nash Street and Glover Road, December 17 to 23 Traffic impact: 232 Street between 32 Avenue to 34A Avenue, December 17 to 18 Traffic impact: 216 Steet between 56 Avenue to 58 Avenue, December 15 to 17 Temporary road closure : 201B Street between 85 Avenue and 86 Avenue, December 19 Special event traffic impact: Fraser Highway between 264 Street and 276 Street, December 13 Traffic impact: 272 Street between 29A Avenue and Fraser Highway, December 12 to 16 Traffic Impact: 56 Avenue between 22800 Block and 232 Street, December 12 to 17 Traffic impact: 56 Avenue between 224 Street to 22900 Block, December 12 to 17 Traffic Impact: 40 Avenue between 232 Street and 240 Street, December 16 to 17 Traffic Impact: 56 Avenue between Langley Bypass and 211 Street, extended to December 15 to 24 Traffic impact: Fraser Highway between 27100 Block and 27300 Block, December 15 to March 27 Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic from 9:00am to 2:30pm. Traffic control personnel will be on site and delays may be experienced. Temporary Road Closure: 83 Avenue between 198 Street and 200 Street, December 15 to December 24 Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to January 16 Traffic impact: 88 Avenue between 22700 Block and Glover Road, December 12 to 19 Traffic impact: 200 Street between 2300 Block to 24 Avenue, December 10 to 17 Traffic impact: 88 Avenue between Trattle Street and Glover Road, December 10 to 19 Traffic impact: 56 Avenue between 232 Street and Clovermeadow Crescent, December 8 to19 Traffic impact: 232 Street between 5700 Block and 64 Avenue, December 5 to 23 Trail closure: Yorkson Creek Trail between 206 Street and 208 Street, extended to December 23 Traffic impact: 86 Avenue between 200 Street and 202B Street, December 1 to Fall 2026 Temporary road closure: 205 Street between 32 Avenue and 36 Avenue, December 1 to January 16 Traffic impact: 88 Avenue between 19600 Block and 200 Street, Extended to April 17 Traffic Impact: 232 Street between 7900 Block and Rawlison Crescent, November 28 to December 22 Traffic impact: 264 Street between 7100 Block and 7400 Block, November 27 to December 21 Traffic impact: 208 Street between 82 Avenue and 83 Avenue, November 17 to December 19 Traffic impact: 88 Ave between 204 Street and 205 Street, November 11 to December 31 Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13 Traffic impact: 48 Avenue between 272 Street and 27500 Block, extended to December 19 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, November 6 to December 31 Traffic impact: 32 Avenue between 202 Street and 204 Street, extended to December 19 Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane. Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Monday, December 8 to Sunday, December 14Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to January 16 Traffic impact: 88 Avenue between 22700 Block and Glover Road, December 12 to 19 Traffic impact: 200 Street between 2300 Block to 24 Avenue, December 10 to 17 Traffic impact: 88 Avenue between Trattle Street and Glover Road, December 10 to 19 Traffic impact: 16 Avenue between 242 Street and 246 Street, December 9 to 12 Traffic impact: 272 Street between 29A Avenue and Fraser Highway, December 8 to 12 Traffic impact: 56 Avenue between 232 Street and Clovermeadow Crescent, December 8 to19 Traffic impact: 232 Street between 5700 Block and 64 Avenue, December 5 to 23 Trail closure: Yorkson Creek Trail between 206 Street and 208 Street, extended to December 23 Traffic impact: 264 Street between 52 Avenue and 56 Avenue, extended till December 12 Traffic impact: 264 Street between 52 Avenue and 56 Avenue, Extended till December 12 Traffic impact: 86 Avenue between 200 Street and 202B Street, December 1 to Fall 2026 Temporary road closure: 205 Street between 32 Avenue and 36 Avenue, December 1 to January 16 Temporary road closure: 198 Street between 83 Avenue and 84 Avenue, December 1 to December 12 Traffic impact: 88 Avenue between 19600 Block and 200 Street, Extended to April 17 Traffic Impact: 232 Street between 7900 Block and Rawlison Crescent, November 28 to December 22 Traffic impact: 264 Street between 7100 Block and 7400 Block, November 27 to December 21 Traffic impact: 208 Street between 82 Avenue and 83 Avenue, November 17 to December 19 Traffic impact: 88 Ave between 204 Street and 205 Street, November 11 to December 31 Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13 Traffic impact: 48 Avenue between 272 Street and 27500 Block, extended to December 19 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, November 6 to December 31 Traffic impact: 32 Avenue between 202 Street and 204 Street, extended to December 19 Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane. Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Monday, December 1 to Sunday, December 7Traffic impact: 232 Street between 5700 Block and 64 Avenue, December 5 to 23 Trail closure: Yorkson Creek Trail between 206 Street and 208 Street, extended to December 23 Traffic impact: 16 Avenue between 227 Street and 232 Street, December 3 to 5 Traffic impact: 264 Street between 52 Avenue and 56 Avenue, extended till December 12 Traffic impact: 264 Street between 52 Avenue and 56 Avenue, Extended till December 12 Traffic impact: 86 Avenue between 200 Street and 202B Street, December 1 to Fall 2026 Temporary road closure: 205 Street between 32 Avenue and 36 Avenue, December 1 to January 16 Temporary road closure: 198 Street between 83 Avenue and 84 Avenue, December 1 to December 12 Traffic impact: 88 Avenue between 19600 Block and 200 Street, Extended to April 17 Traffic Impact: 232 Street between 7900 Block and Rawlison Crescent, November 28 to December 22 Traffic impact: 264 Street between 7100 Block and 7400 Block, November 27 to December 21 Traffic Impact: 56 Avenue between Langley Bypass and 211 Street, November 24 to December 5 Traffic impact: Old Yale Road between 224 Street to 22500 Block, November 24 to December 5 Traffic impact: 208 Street between 82 Avenue and 83 Avenue, November 17 to December 19 Traffic impact: 88 Ave between 204 Street and 205 Street, November 11 to December 31 Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13 Traffic impact: 48 Avenue between 272 Street and 27500 Block, extended to December 19 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, November 6 to December 31 Traffic impact: 264 Street between 52 Avenue and 56 Avenue, November 5 to December 5 Traffic impact: 32 Avenue between 202 Street and 204 Street, extended to December 19 Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane. Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 |
| Closures and Impacts - November 2025 |
Monday, November 24 to Sunday, November 30Traffic impact: 88 Avenue between 19600 Block and 200 Street, Extended to April 17 Traffic Impact: 232 Street between 7900 Block and Rawlison Crescent, November 28 to December 22 Traffic impact: 264 Street between 7100 Block and 7400 Block, November 27 to December 21 Traffic Impact: Glover Road between University Drive and 7800 Block, November 24 to 28 Traffic Impact: 56 Avenue between Langley Bypass and 211 Street, November 24 to December 5 Traffic impact: 32 Avenue between 269 Street to 270 Street, November 24 to 28 Traffic impact: Old Yale Road between 224 Street to 22500 Block, November 24 to December 5 Traffic impact: 208 Street between 82 Avenue and 83 Avenue, November 17 to December 19 Temporary road closures: 84 Avenue between 196 Street and 198 Street, November 10 to 28 Traffic impact: 88 Ave between 204 Street and 205 Street, November 11 to December 31 Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13 Traffic impact: 48 Avenue between 272 Street and 27500 Block, extended to December 19 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, November 6 to December 31 Traffic impact: 264 Street between 52 Avenue and 56 Avenue, November 5 to December 5 Trail closure: Yorkson Creek Trail between 206 Street and 208 Street, November 3 to December 1 Traffic impact: River Road and 252 Street, extended to November 30 Traffic impact: 32 Avenue between 202 Street and 204 Street, extended to December 19 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, extended to November 30 Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane. Traffic impact: 216 Street between 6700 Block and Highway 10, October 15 to November 30 Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Monday, November 17 to Sunday, November 23Traffic impact: 24 Avenue between 256 Street and 264 Street, November 17 to 21 Traffic impact: 208 Street between 82 Avenue and 83 Avenue, November 17 to December 19 Temporary road closure: 201B Street between 85 Avenue and 86 Avenue, November 20 Temporary road closures: 84 Avenue between 196 Street and 198 Street, November 10 to 28 Traffic impact: 88 Ave between 204 Street and 205 Street, November 11 to December 31 Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13 Traffic impact: 48 Avenue between 272 Street and 27500 Block, extended to December 19 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, November 6 to December 31 Traffic impact: 264 Street between 52 Avenue and 56 Avenue, November 5 to December 5 Trail closure: Yorkson Creek Trail between 206 Street and 208 Street, November 3 to December 1 Traffic impact: River Road and 252 Street, extended to November 30 Traffic impact: 32 Avenue between 202 Street and 204 Street, extended to December 19 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, extended to November 30 Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane. Traffic impact: 216 Street between 6700 Block and Highway 10, October 15 to November 30 Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Monday, November 10 to Sunday, November 16Traffic Impact: 16 Avenue between 24400 Block and 246 Street, November 12 Special event road closure: Glover Road between 88 Avenue and 96 Avenue, November 11 Special event road closure: Fraser Highway between 264 Street and 271 Street, November 11 Temporary road closures: 84 Avenue between 196 Street and 198 Street, November 10 to 28 Traffic impact: 88 Ave between 204 Street and 205 Street, November 11 to December 31 Traffic impact: 252 Street, North of 88 Avenue, November 12 to 14 Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13 Traffic impact: 48 Avenue between 272 Street and 27500 Block, extended to December 19 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, November 6 to December 31 Traffic impact: 264 Street between 52 Avenue and 56 Avenue, November 5 to December 5 Traffic impact: 76 Avenue between 204 Street and 206 Street, November 4 to 14 Trail closure: Yorkson Creek Trail between 206 Street and 208 Street, November 3 to December 1 Traffic impact: River Road and 252 Street, extended to November 30 Traffic impact: 32 Avenue between 202 Street and 204 Street, extended to December 19 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, extended to November 30 Traffic impact: 40 Avenue between 208 Street and 213A Street, extended to November 15 Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane. Traffic impact: 216 Street between 6700 Block and Highway 10, October 15 to November 30 Traffic impact: Fraser Highway between 27100 Block and 27300 Block, October 2 to November 14 Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic during the following hours:
Traffic control personnel will be on site and delays may be experienced. Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: 88 Avenue between 19600 Block to 200 Street, September 18 to November 11 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30
Monday, November 3 to Sunday, November 9Traffic impact: Fraser Highway between 24300 Block and 248 Street, November 9 Traffic impact: Glover Road between Mavis Ave and Billy Brown Road, November 6 to 14 Traffic impact: 248 Street between 48 Avenue and 50 Avenue, November 6 to February 13 Traffic impact: 48 Avenue between 272 Street and 27500 Block, extended to December 19 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, November 6 to December 31 Traffic impact: 264 Street between 52 Avenue and 56 Avenue, November 5 to December 5 Traffic impact: 76 Avenue between 204 Street and 206 Street, November 4 to 14 Trail closure: Yorkson Creek Trail between 206 Street and 208 Street, November 3 to December 1 Traffic impact: 52 Avenue between 216 Street and 217A Street, November 3 to November 7 Traffic impact: River Road and 252 Street, extended to November 30 Traffic impact: 32 Avenue between 202 Street and 204 Street, extended to December 19 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, extended to November 30 Traffic impact: 56 Avenue between 211 Street and Langley Bypass, October 30 to November 7 Traffic impact: 40 Avenue between 208 Street and 213A Street, extended to November 15 Traffic Impact: 44 Avenue between 216 Street and 217B Street, extended to October 31 Traffic impact: 196 Street between 84 Avenue and 86 Avenue, October 27 to November 7 Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31 Traffic impact: 88 Avenue between 217A Street and 223 Street, October 27 to November 7 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Maintenance on the Nathan Slough Bridge at 272 Street, between the 8700 and 8800 Block, will result in a speed reduction of 30km/hour from October 10 to 13. Signage is in place to indicate speed reduction. Starting October 14 until further notice, the south bound lane (west half of bridge) will be closed to traffic with single lane alternating traffic allowed via temporary traffic signal. Temporary barriers have been installed on the south bound lane. Traffic impact: 216 Street between 6700 Block and Highway 10, October 15 to November 30 Traffic impact: 216 Street between 96 Avenue and 9700 Block, extended to November 8 Traffic impact: Fraser Highway between 27100 Block and 27300 Block, October 2 to November 14 Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic during the following hours:
Traffic control personnel will be on site and delays may be experienced. Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: 88 Avenue between 19600 Block to 200 Street, September 18 to November 11 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 |
| Closures and Impacts - October 2025 |
Monday, October 27 to Sunday, November 2Traffic impact: 224 Street between 0 Avenue and 4 Avenue, Sunday, November 2 Traffic impact: River Road and 252 Street, extended to November 30 Traffic impact: 32 Avenue between 202 Street and 204 Street, extended to December 19 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, extended to November 30 Traffic impact: 56 Avenue between 211 Street and Langley Bypass, October 30 to November 7 Traffic impact: 40 Avenue between 208 Street and 213A Street, extended to November 15, 2025 Traffic Impact: 44 Avenue between 216 Street and 217B Street, extended to October 31 Traffic impact: 196 Street between 84 Avenue and 86 Avenue, October 27 to November 7 Traffic impact: 205 Street between 32 Avenue and 36 Avenue, October 27 to January 31 Traffic impact: 88 Avenue between 217A Street and 223 Street, October 27 to November 7 Traffic impact: 200 Street between 42 Avenue and 44 Avenue, October 20 to 31 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Traffic impact: 216 Street between 6700 Block and Highway 10, October 15 to November 30 Traffic impact: 216 Street between 96 Avenue and 9700 Block, extended to November 8 Traffic impact: 40 Avenue between 213A Street and 216 Street, October 6 to 31 Traffic impact: 32 Avenue between 202 Street and 204 Street, October 6 to 31 Traffic impact: Fraser Highway between 27100 Block and 27300 Block, October 2 to November 14 Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic during the following hours:
Traffic control personnel will be on site and delays may be experienced. Traffic impact: 264 Street between 72 Avenue and 7400 Block, September 29 to October 31 Traffic impact: 232 Street between 7800 Block and Rawlison Crescent, September 29 to October 31 Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: 88 Avenue between 19600 Block to 200 Street, September 18 to November 11 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Traffic impact: Glover Road between University Drive and 7800 Block, September 12 to October 31 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, September 8 to October 31
Monday, October 20 to Sunday, October 26Traffic impact: 88 Avenue between 217A Street and 223 Street, October 27 to November 7 Traffic Impact: 44 Avenue between 216 Street and 217B Street, October 27 Traffic impact: 264 Street between 62 Avenue and 65 Avenue, October 22 Traffic impact: 72 Avenue between 209A Street and Crush Crescent and Crush Crescent between 72 Avenue and 21300 Block, October 20 to 21 Traffic impact: 56 Avenue between 232 Street and Clovermeadow Crescent, October 20 to 24 Traffic impact: 200 Street between 42 Avenue and 44 Avenue, October 20 to 31 Traffic impact: 208 Street and 72 Avenue, October 15 to 22 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Traffic impact: 216 Street between 6700 Block and Highway 10, October 15 to November 30 Traffic impact: 56 Avenue between 211 Street and Langley Bypass, October 14 to 24 Traffic impact: 216 Street between 96 Avenue and 9700 Block, extended to November 8 Traffic impact: 40 Avenue between 213A Street and 216 Street, October 6 to 31 Traffic impact: 32 Avenue between 202 Street and 204 Street, October 6 to 31 Traffic impact: Fraser Highway between 27100 Block and 27300 Block, October 2 to November 14 Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic during the following hours:
Traffic control personnel will be on site and delays may be experienced. Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to October 26 Traffic impact: 264 Street between 72 Avenue and 7400 Block, September 29 to October 31 Traffic impact: 232 Street between 7800 Block and Rawlison Crescent, September 29 to October 31 Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: Fraser Highway between 240 Street and 265A Street, September 22 to October 24 Traffic impact: 88 Avenue between 19600 Block to 200 Street, September 18 to November 11 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Traffic impact: Glover Road between University Drive and 7800 Block, September 12 to October 31 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, September 8 to October 31 Monday, October 13 to Sunday, October 19Traffic impact: 208 Street and 72 Avenue, October 15 to 22 Traffic impact: Nathan Slough Bridge 272 Street and 8800 Block, October 10 until further notice Traffic impact: 216 Street between 6700 Block and Highway 10, October 15 to November 30 Traffic impact: 56 Avenue between 211 Street and Langley Bypass, October 14 to 24 Traffic impact: 216 Street between 96 Avenue and 9700 Block, extended to November 8 Traffic impact: 40 Avenue between 213A Street and 216 Street, October 6 to 31 Traffic impact: 32 Avenue between 202 Street and 204 Street, October 6 to 31 Traffic impact: 272 Street between 30 Avenue and Fraser Highway, October 6 to 17 Traffic impact: Fraser Highway between 27100 Block and 27300 Block, October 2 to November 14 Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic during the following hours:
Traffic control personnel will be on site and delays may be experienced. Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to October 26 Traffic impact: 264 Street between 72 Avenue and 7400 Block, September 29 to October 31 Traffic impact: 232 Street between 7800 Block and Rawlison Crescent, September 29 to October 31 Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: Fraser Highway between 240 Street and 265A Street, September 22 to October 24 Traffic impact: 88 Avenue between 19600 Block to 200 Street, September 18 to November 11 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Traffic impact: Glover Road between University Drive and 7800 Block, September 12 to October 31 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, September 8 to October 31 Traffic impact: Fraser Highway between 244 Street and 256 Street, September 1 to October 14. Monday, October 6 to Sunday, October 12Traffic impact: 216 Street between 96 Avenue and 9700 Block, extended to November 8 Traffic impact: 72 Avenue between 23700 Block and 24200 Block, October 8 to 9 Special event road closure: Glover Road between Mavis Avenue and Francis Avenue, October 10 to 13 Traffic impact: 40 Avenue between 213A Street and 216 Street, October 6 to 31 Traffic impact: 32 Avenue between 202 Street and 204 Street, October 6 to 31 Traffic impact: 272 Street between 30 Avenue and Fraser Highway, October 6 to 17 Traffic impact: 36 Avenue between 204 Street and 207 Street, October 6 to 10 Traffic impact: Fraser Highway between 27100 Block and 27300 Block, October 2 to November 14 Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic during the following hours:
Traffic control personnel will be on site and delays may be experienced. Traffic impact: 200 Street between 91A Avenue and 96 Avenue, extended to October 10 Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to October 26 Traffic impact: 264 Street between 72 Avenue and 7400 Block, September 29 to October 31 Traffic impact: 232 Street between 7800 Block and Rawlison Crescent, September 29 to October 31 Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: Fraser Highway between 240 Street and 265A Street, September 22 to October 24 Traffic impact: 88 Avenue between 19600 Block to 200 Street, September 18 to November 11 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Traffic impact: Glover Road between University Drive and 7800 Block, September 12 to October 31 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, September 8 to October 31 Traffic impact: 216 Street between 96 Avenue and 9700 Block, September 8 to October 8 Traffic impact: Fraser Highway between 244 Street and 256 Street, September 1 to October 14. Monday, September 29 to Sunday, October 5Traffic impact: 16 Avenue between 256 Street and 260 Street, extended to October 5 Traffic impact: Fraser Highway between 27100 Block and 27300 Block, October 2 to November 14 Additionally, utility work will occur on 272 Street, between 29A Avenue and the 3100 Block, with single lane alternating traffic during the following hours:
Traffic control personnel will be on site and delays may be experienced. Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to October 26 Traffic impact: 16 Avenue between 256 Street and 260 Street, October 1 to 3 Traffic impact: 200 Street between 91A Avenue and 96 Avenue, September 29 to October 3 Traffic impact: 264 Street between 72 Avenue and 7400 Block, September 29 to October 31 Traffic impact: 232 Street between 7800 Block and Rawlison Crescent, September 29 to October 31 Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: Fraser Highway between 240 Street and 265A Street, September 22 to October 24 Traffic impact: 8 Avenue between 264 Street and 272 Street, September 22 to October 3 Traffic impact: 88 Avenue between 19600 Block to 200 Street, September 18 to November 11 Traffic impact: 204 Street between 64 Avenue and 70 Avenue, September 17 to October 1 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Traffic impact: Glover Road between University Drive and 7800 Block, September 12 to October 31 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, September 8 to October 31 Traffic impact: 216 Street between 96 Avenue and 9700 Block, September 8 to October 8 Trail closure: Zeigler Trail, September 4 to 30 Traffic impact: Fraser Highway between 244 Street and 256 Street, September 1 to October 14. |
| Closures and Impacts - September 2025 |
Monday, September 22 to Sunday, September 28Traffic impact: 203 Street between 66 Avenue and 67 Avenue and 66 Avenue between 203 Street and 205 Street, extended to January 30 Traffic impact: Cycling event throughout Langley, September 26 Traffic impact: 201B Street between 85 Avenue and 86 Avenue, September 23 Traffic impact: 16 Avenue between 232 street to 23400 Block, September 23 Traffic impact: Fraser Highway between 240 Street and 265A Street, September 22 to October 24 Traffic impact: 8 Avenue between 264 Street and 272 Street, September 22 to October 3 Traffic impact: Fraser Highway between 27000 Block to 27200 Block, September 21 to 23 Traffic impact: 88 Avenue between 19600 Block to 200 Street, September 18 to November 11 Traffic impact: 204 Street between 64 Avenue and 70 Avenue, September 17 to October 1 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Traffic impact: 24 Avenue between 224 Street to 228 Street, September 15 to 26 Traffic impact: 36 Avenue between 200 Street and 204 Street, extended to September 26 Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to September 26 Traffic impact: Glover Road between University Drive and 7800 Block, September 12 to October 31 Traffic impact: 248 Street between Fraser Highway and 36 Avenue, September 10 to 26
Traffic impact: 72 Avenue between 209A Street and 212 Connector, September 9 to September 29 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, September 8 to October 31 Traffic impact: 216 Street between 96 Avenue and 9700 Block, September 8 to October 8 Trail closure: Zeigler Trail, September 4 to 30 Traffic impact: Fraser Highway between 244 Street and 256 Street, September 1 to October 14. Monday, September 15 to Sunday, September 21Traffic impact: Fraser Highway between 27000 Block to 27200 Block, September 21 to 23 Traffic impact: 88 Avenue between 19600 Block to 200 Street, September 18 to November 11 Traffic impact: Intersection of 208 Street at 80 Avenue, September 18 to 21
Traffic control personnel will be on site and delays may be experienced. Traffic impact: Fraser Highway between 216 Street and 232 Street, September 18 to 22 Traffic impact: Fraser Highway between 25100 Block to 25400 Block, September 18 to 20 Traffic impact: 204 Street between 64 Avenue and 70 Avenue, September 17 to October 1 Traffic impact: 80 Avenue between 204 Street and 212 Street, September 16 to January 31 Traffic impact: 48 Avenue between Old Yale Road and 219 Street, September 16 to September 17 Traffic impact: 80 Avenue between 192 Street and 197 Street, September 15 to January 30 Traffic impact: 24 Avenue between 224 Street to 228 Street, September 15 to 26 Traffic impact: 48 Avenue between 272 Street and 27500 Block, September 15 to 20
Traffic control personnel will be on site and delays may be experienced. Traffic impact: 200 Street between 38A Avenue and 39A Avenue, September 15 Traffic impact: 36 Avenue between 200 Street and 204 Street, extended to September 26 Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to September 26 Traffic impact: Glover Road between University Drive and 7800 Block, September 12 to October 31 Traffic impact: 248 Street between Fraser Highway and 36 Avenue, September 10 to 26
Traffic impact: 72 Avenue between 209A Street and 212 Connector, September 9 to September 29 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, September 8 to October 31 Traffic impact: 216 Street between 96 Avenue and 9700 Block, September 8 to October 8 Traffic impact: 96 Avenue between McKinnon Crescent and 222 Street, September 8 to 19 Trail closure: Zeigler Trail, September 4 to 30 Traffic impact: Fraser Highway between 244 Street and 256 Street, September 1 to October 14. Monday, September 8 to Sunday, September 14Temporary road closure: Glover Road and 96 Avenue in the Fort Langley area, September 14 Traffic impact: 36 Avenue between 200 Street and 204 Street, extended to September 26 Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to September 26 Traffic impact: Glover Road between University Drive and 7800 Block, September 12 to October 31 Traffic impact: Intersection of 208 Street at 80 Avenue, September 12 to 15 and September 18 to 21 BC Hydro work at the intersection of 208 Street and 80 Avenue will result in single lane, alternating traffic 24-hours a day during these dates and times:
Traffic control personnel will be on site and delays may be experienced. Road closure: 80 Avenue between 204 Street and 212 Street, September 12 to 15 Traffic impact: 96 Avenue between 210 Street and 21500 Block, September 12 to 15 Traffic impact: 248 Street between Fraser Highway and 36 Avenue, September 10 to 26
Traffic impact: 72 Avenue between 209A Street and 212 Connector, September 9 to September 29 Traffic impact: 272 Street between Fraser Highway and 32 Avenue, September 8 to October 31 Traffic impact: 216 Street between 96 Avenue and 9700 Block, September 8 to October 8 Traffic impact: 96 Avenue between McKinnon Crescent and 222 Street, September 8 to 19 Traffic impact: 216 Street between Glover Road and 7300 Block, September 5 to 8 Trail closure: Zeigler Trail, September 4 to 30 Traffic impact: Fraser Highway between 244 Street and 256 Street, September 1 to October 14. Traffic impact: 200 Street between 24 Avenue and 28 Avenue, August 20 to September 12 Monday September 1 to Sunday, September 7Special event road closure: Fraser Highway between 264 Street and 272 Street, September 6 Traffic impact: 216 Street between Glover Road and 7300 Block, September 5 to 8 Traffic impact: Rawlison Crescent between 23100 Block and 23400 Block, September 5 Trail closure: Zeigler Trail, September 4 to 30 Traffic Impact: Glover Road between Highway 10 and 7600 Block, September 3 to 5 Traffic impact: Fraser Highway between 270 Street and 273 Street, September 3 to 4 Traffic impact: Crush Crescent between Smith Crescent and 21200 Block, September 2 Traffic impact: Fraser Highway between 244 Street and 256 Street, September 1 to October 14. Traffic impact: 56 Avenue between 210A Street and Highway 10, August 28 to September 5 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, August 20 to September 12 |
| Closures and Impacts - August 2025 |
Monday, August 25 to Sunday, August 31, 2025Traffic impact: 201B Street between 85 Avenue and 86 Avenue, August 29 Traffic impact: 56 Avenue between 210A Street and Highway 10, August 28 to September 5 Traffic impact: 16 Avenue between 227 Street and 22800 Block, August 28 Traffic impact: Glover Road between Springbrook Crescent and 7600 Block, August 25 to 27 Traffic Impact: 267 Street between 64 Avenue and 7100 Block, August 25 to 29 Traffic impact: 248 Street between 52 Avenue and 55A Avenue, August 25 to 29 Traffic impact: 56 Avenue between 210A Street and Highway 10, August 25 to 29 Traffic impact: 96 Avenue between Billy Brown Road and McKinnon Crescent, Extended to August 31
Traffic control personnel will be on site and delays may be experienced. Traffic impact: Glover Road between Telegraph Trail and Rawlison Crescent, August 24 to 26 Traffic Impact: Crush Crescent between Glover Rd and Smith Crescent, August 21 to 29 Traffic impact: 96 Avenue between Yeomans Crescent and 213 Street, August 21 to 29 Traffic impact: 200 Street between 24 Avenue and 28 Avenue, August 20 to September 12 Monday, August 18 to Sunday, August 24, 2025Special Event Traffic Impact: 246B St between 56 Avenue to 58A Avenue, August 23 Traffic impact: 96 Avenue between Billy Brown Road and McKinnon Crescent, Extended to August 31
Traffic control personnel will be on site and delays may be experienced. Traffic impact: 200 Street between 24 Avenue and 28 Avenue, August 20 to September 12 Traffic impact: 200 Street between 24 Avenue and 32 Avenue, August 20 Traffic impact: 56 Avenue between 216 Street and 22000 Block, August 20 to 22 Traffic Impact: Crush Crescent between Glover Rd and Smith Crescent, August 21 to 29 Traffic impact: 96 Avenue between Yeomans Crescent and 213 Street, August 21 to 29 Traffic impact: 196 Street between 68 Avenue and 72 Avenue, extended to August 22 Traffic impact: 232 Street between 5178 Block and 5760 Block, August 22 Maintenance work on 232 Street between 5178 Block and 5760 Block, will result in intermittent north bound lane closures and single lane alternating traffic from 7am to 3pm on August 22. Traffic control personnel will be on site and delays may be experienced. Traffic impact: Glover Road between Telegraph Trail and Rawlison Crescent, August 22 to 25 Traffic impact: 56 Avenue between Wagonwheel Crescent and 238 Street, August 23 Traffic impact: Glover Road between Telegraph Trail and Rawlison Crescent, August 24 to 26 Monday, August 11 to Sunday, August 17, 2025Traffic impact: Highway 1 westbound between west of Mt. Lehman Road to west of 264 Street, mid-August Starting mid-August 2025, traffic along Highway 1 westbound, from west of Mt. Lehman Road to west of 264 Street, will move to newly constructed lanes in the median. The reconfigured westbound off- and on-ramps at 264 Street will connect to these new lanes. As early as mid-September 2025, traffic along Highway 1 eastbound, from east of 264 Street to east of Mt. Lehman Road, will move to newly constructed lanes in the median and onto the new westbound Bradner overpass. These changes are in addition to ongoing overnight lane closures and are needed for the continued safe construction of the 264 Street Interchange, advancing the widening of Highway 1 through the Fraser Valley. Drivers are reminded to slow down and follow posted signs. Visit DriveBC for the most current information. Traffic impact: 264 Street between 72 Avenue and 7400 Block, August 14 to September 11 Spray park closure: Fort Langley spray park, August 13 BC Hydro work at Fort Langley Community Park will result in the spray park being closed on August 13 until approximately 4pm. Please visit our other spray park locations. Traffic Impact: 88 Avenue and 252 Street intersection, extended to August 19 Road closure: 201 Street between 82 Avenue and 83A Avenue, August 18 Traffic impact: 208 Street and 72 Avenue, August 15 to 23 Partial trail closure: Carvolth Trail, August 13 to 29 Traffic impact: 264 Street between 84 Avenue and 88 Avenue, August 13 to 15 Traffic impact: 271 Street between 31A Avenue and 32 Avenue, August 13 to 14 Traffic impact: 16 Avenue between 24340 Block and 34307 Block, August 12 to 14 Traffic impact: 208 Street between 82 Avenue and 83 Avenue, August 11 to 29 Traffic impact: 64 Avenue between 264 Street and 260 Street, August 11 to 22 Traffic impact: 36 Avenue between 200 Street and 204 Street, August 11 to 12 Monday, August 4 to Sunday, August 10, 2025Overnight traffic impact: Highway 1 at 264 Street interchange, August 6 to 10 For any questions or inquiries, please contact the project line at 1-844-851-4180 or hwy1fv@gov.bc.ca Road closure and traffic impact: 88 Avenue between 256 Street and 264 Street, August 5 to 29 Once 88 Avenue reopens, continued work on 264 Street, just south of 88 Avenue, will result in single lane alternating traffic on Monday to Friday, 7am to 5pm, from August 18 to 29. Traffic control personnel will be on site and delays may be experienced. While every effort is being made to complete the project as quickly as possible, motorists are advised to consider alternate routes and allow extra time to reach their destination safely. Traffic impact: 221A Street between 50 Avenue and 52 Avenue, August 5 Traffic impact: 248 Street between 24 Avenue and 32 Avenue, August 6 to 8 Traffic impact: 272 Street between 24 Avenue and 28 Avenue, August 9 Monday, July 28 to Sunday, August 3, 2025Traffic impact: 272 Street between 32 Avenue and Fraser Highway, extended to August 31 Traffic Impact: Fraser Highway between 234 Street and 243 Street, August 1 to 31 Traffic impact: 52 Avenue between 219A Street and 224 Street, July 31 to August 1 Traffic Impact: 248 Street between 6700 Block and 72 Avenue, July 30 Traffic impact: 80 Avenue at 204 Street, July 29 to August 14 Road closure: 80 Avenue between 204 Street and 206 Street, July 28 to August 29 Local access will be maintained for residents, pedestrians, and businesses. Motorists are advised to consider alternate routes and allow extra time to reach their destination safely. Traffic impact: 232 Street between 76A Avenue and Rawlison Crescent, July 28 to August 24 Traffic impact: 262 Street between 29 Avenue and 30A Avenue, July 28 to August 15 Road testing on 262 Street between 29 Avenue and 30A Avenue will result in single lane alternating traffic from Monday to Friday between 8am and 5pm. Additionally, single lane alternating traffic will be in effect on 30A Avenue between 262 Street and 264 Street, from Monday to Friday between 8am and 5pm. Traffic control personnel will be on site and delays may be experienced. Traffic impact: 213A Street between 56 Avenue and 57A Avenue, July 28 to August 15 Traffic Impact: Culvert replacement work on 63 Avenue at the 24200 Block, July 28 to Late September Construction will begin Monday, July 28 and is scheduled to take place Monday through Saturday, between 7am and 5pm. Project completion is anticipated for late September. During this time, 63 Avenue at the 24200 Block will remain open with a 24-hour a day single lane alternating traffic flow in place. Traffic control personnel will be on site during normal working hours. Outside of the working hours, automated traffic control signals will be in place. Construction noise, dust, and traffic delays along 63 Avenue may be experienced. Traffic impact: Fraser Highway between 271 Street and 237 Street, July 16 to 31 Additionally, single lane alternating traffic will be in effect on 272 Street between 29A Avenue and Fraser Highway, from Monday to Friday between 9:00am and 2:30pm. Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to September 5 Traffic impact: 203 Street between 66 Avenue and 67 Avenue, extended to September 29 Traffic and pedestrian impact: St. Andrews Avenue between Glover Road and Nash Street, July 7 to September 1 Road closure: Old Yale Road between 215 Street and 216 Street, July 2 to August 29 Traffic impact: 88 Avenue and 252 Street intersection, Extended to August 8 Traffic impact: 72 Avenue between 202A Street and 205 Street, June 27 to August 29 Traffic impact: 80 Avenue between 204 Street and 212 Street, June 23 to January 31 Traffic impact: 272 Street between 32 Avenue and Fraser Highway, June 9 to July 31 |
| Closures and Impacts - July 2025 |
Monday, July 28 to Sunday, August 3, 2025Traffic impact: 52 Avenue between 219A Street and 224 Street, July 31 to August 1 Traffic Impact: 248 Street between 6700 Block and 72 Avenue, July 30 Traffic impact: 80 Avenue at 204 Street, July 29 to August 14 Road closure: 80 Avenue between 204 Street and 206 Street, July 28 to August 29 Local access will be maintained for residents, pedestrians, and businesses. Motorists are advised to consider alternate routes and allow extra time to reach their destination safely. Traffic impact: 232 Street between 76A Avenue and Rawlison Crescent, July 28 to August 24 Traffic impact: 262 Street between 29 Avenue and 30A Avenue, July 28 to August 15 Road testing on 262 Street between 29 Avenue and 30A Avenue will result in single lane alternating traffic from Monday to Friday between 8am and 5pm. Additionally, single lane alternating traffic will be in effect on 30A Avenue between 262 Street and 264 Street, from Monday to Friday between 8am and 5pm. Traffic control personnel will be on site and delays may be experienced. Traffic impact: 213A Street between 56 Avenue and 57A Avenue, July 28 to August 15 Traffic Impact: Culvert replacement work on 63 Avenue at the 24200 Block, July 28 to Late September Construction will begin Monday, July 28 and is scheduled to take place Monday through Saturday, between 7am and 5pm. Project completion is anticipated for late September. During this time, 63 Avenue at the 24200 Block will remain open with a 24-hour a day single lane alternating traffic flow in place. Traffic control personnel will be on site during normal working hours. Outside of the working hours, automated traffic control signals will be in place. Construction noise, dust, and traffic delays along 63 Avenue may be experienced. Traffic impact: Fraser Highway between 271 Street and 237 Street, July 16 to 31 Additionally, single lane alternating traffic will be in effect on 272 Street between 29A Avenue and Fraser Highway, from Monday to Friday between 9:00am and 2:30pm. Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to August 15 Traffic impact: 203 Street between 66 Avenue and 67 Avenue, extended to September 29 Traffic and pedestrian impact: St. Andrews Avenue between Glover Road and Nash Street, July 7 to September 1 Road closure: Old Yale Road between 215 Street and 216 Street, July 2 to August 29 Traffic impact: 88 Avenue and 252 Street intersection, Extended to August 8 Traffic impact: 72 Avenue between 202A Street and 205 Street, June 27 to August 29 Traffic impact: 80 Avenue between 204 Street and 212 Street, June 23 to January 31 Traffic impact: 272 Street between 32 Avenue and Fraser Highway, June 9 to July 31
Monday, July 21 to Sunday, July 27, 2025Special event road closure: Mary Avenue between Glover Road and Church Street, July 25 to 28 The Fort Langley Jazz and Arts Festival will close Mary Avenue between Glover Road and Church Street from July 25 at 12pm through to July 28 at 12pm. A detour will be in effect indicated by signage. Delays may be experienced. Traffic impact: Fraser Highway between 271 Street and 237 Street, July 16 to 31 Utility scoping work is scheduled on Fraser Highway between 271 Street and 237 Street on July 16 to July 31. This work will result in single lane alternating traffic from Monday to Friday between 9:00am and 2:30pm. Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to August 15 Traffic impact: 203 Street between 66 Avenue and 67 Avenue, extended to September 29 Traffic impact: Highway 1 - 264 Street Interchange Project, July 8 to 22 The slow roll closures will begin July 8, and take place on weeknights only between 11:00pm and 4:30am until MJuly 22. Each slow roll closure may last up to 20 minutes, with a total of four (4) slow roll closures anticipated throughout the duration of this work. Traffic queues will be monitored in real time to manage flow and minimize delays. For any questions or inquiries, please contact the project line by phone at 1.844.851.4180 or by email at hwy1fv@gov.bc.ca Traffic and pedestrian impact: St. Andrews Avenue between Glover Road and Nash Street, July 7 to September 1 Road closure: Old Yale Road between 215 Street and 216 Street, July 2 to August 29 Traffic impact: 88 Avenue and 252 Street intersection, Extended to August 8 Traffic impact: 72 Avenue between 202A Street and 205 Street, June 27 to August 29 Traffic impact: 80 Avenue between 204 Street and 212 Street, June 23 to January 31 Traffic impact: 204 Street and 80 Avenue, June 16 to July 27 Traffic impact: 272 Street between 32 Avenue and Fraser Highway, June 9 to July 31
Monday, July 14 to Sunday, July 20, 2025Potential Traffic impact: half marathon in Fort Langley, July 20 Traffic impact: Fraser Highway between 271 Street and 237 Street, July 16 to 31 Utility scoping work is scheduled on Fraser Highway between 271 Street and 237 Street on July 16 to July 31. This work will result in single lane alternating traffic from Monday to Friday between 9:00am and 2:30pm. Traffic impact: 272 Street between 28A Avenue and 29 Avenue, extended to August 15 Traffic impact: 203 Street between 66 Avenue and 67 Avenue, extended to September 29 Traffic impact: 200 Street between 24 Avenue and 34 Avenue, July 14 to 18 Traffic impact: 88 Avenue between 216 Street and 222A Street, July 14 to 18 Temporary road closure: 76 Avenue between 200 Street and 202A Street, July 13 to 16 Traffic impact: 80 Avenue between 206 Street and 208 Street, July 12 to 15 Traffic impact: 80 Avenue between 212 Street and 216 Street, July 9 to 15 Traffic impact: Highway 1 - 264 Street Interchange Project, July 8 to 22 The slow roll closures will begin July 8, and take place on weeknights only between 11:00pm and 4:30am until MJuly 22. Each slow roll closure may last up to 20 minutes, with a total of four (4) slow roll closures anticipated throughout the duration of this work. Traffic queues will be monitored in real time to manage flow and minimize delays. For any questions or inquiries, please contact the project line by phone at 1.844.851.4180 or by email at hwy1fv@gov.bc.ca Traffic and pedestrian impact: St. Andrews Avenue between Glover Road and Nash Street, July 7 to September 1 Road closure: Old Yale Road between 215 Street and 216 Street, July 2 to August 29 Traffic impact: 88 Avenue and 252 Street intersection, Extended to August 8 Traffic impact: 204 Street and 80 Avenue, Extended to July 18 Traffic impact: 72 Avenue between 202A Street and 205 Street, June 27 to August 29 Traffic impact: 80 Avenue between 204 Street and 212 Street, June 23 to January 31 Traffic impact: 204 Street and 80 Avenue, June 16 to July 27 Traffic impact: 272 Street between 32 Avenue and Fraser Highway, June 9 to July 31
Monday, July 7 to Sunday, July 13, 2025Traffic impact: Telegraph Trail between 216 Street and 21900 Block, July 10 to 11 Traffic impact: 80 Avenue between 212 Street and 216 Street, July 9 to 15 Traffic Impact: 216 Street between 47A Avenue and 48 Avenue, July 9 to 11 Traffic impact: Highway 1 - 264 Street Interchange Project, July 8 to 22 As part of the Highway 1 – 264th Street Interchange Project, BC Hydro will be relocating overhead power lines across Highway 1 between 248 Street and Lefeuvre Road. This work will require intermittent overnight slow roll closures in both directions of Highway 1. Please note that eastbound and westbound lanes will not be impacted simultaneously. The slow roll closures will begin July 8, and take place on weeknights only between 11:00pm and 4:30am until MJuly 22. Each slow roll closure may last up to 20 minutes, with a total of four (4) slow roll closures anticipated throughout the duration of this work. Traffic queues will be monitored in real time to manage flow and minimize delays. For any questions or inquiries, please contact the project line by phone at 1.844.851.4180 or by email at hwy1fv@gov.bc.ca Traffic impact: Golden Ears Bridge 201 Street on-ramp, July 8 to 10 Traffic and pedestrian impact: St. Andrews Avenue between Glover Road and Nash Street, July 7 to September 1 Traffic impact: Crush Crescent between 72 Avenue and Glover Road, July 7 to 11 Road closure: Crush Crecent between 72 Avenue and Glover Road, July 7 to 8 Road closure: Old Yale Road between 215 Street and 216 Street, July 2 to August 29 Traffic impact: 88 Avenue and 252 Street intersection, Extended to August 8 Traffic impact: 56 Avenue between 239 Street and 240 Street, June 30 to July 11 Traffic impact: 204 Street and 80 Avenue, Extended to July 18 Traffic impact: 72 Avenue between 202A Street and 205 Street, June 27 to August 29 Traffic impact: 80 Avenue between 204 Street and 212 Street, June 23 to January 31 Traffic impact: 204 Street and 80 Avenue, June 16 to July 27 Traffic impact: 272 Street between 32 Avenue and Fraser Highway, June 9 to July 31
|
| Closures and Impacts - June 2025 |
Monday, June 30 to Sunday, July 6, 2025Road closure: Old Yale Road between 215 Street and 216 Street, July 2 to August 29 Traffic impact: 88 Avenue and 252 Street intersection, Extended to August 8 Traffic impact: 202B Street between 68 Avenue and 72 Avenue, July 2 to 4 Traffic impact: 56 Avenue between 239 Street and 240 Street, June 30 to July 11 Traffic impact: 204 Street and 80 Avenue, Extended to July 18 Traffic impact: 72 Avenue between 202A Street and 205 Street, June 27 to August 29 Traffic impact: 80 Avenue between 204 Street and 212 Street, June 23 to January 31 Traffic impact: 204 Street and 80 Avenue, June 16 to July 27 Traffic impact: 272 Street between 32 Avenue and Fraser Highway, June 9 to July 31 Monday, June 23 to Sunday, June 29, 2025Special event road closure: 86 Avenue between 196 Street and 200 Street, June 28. Traffic impact: 72 Avenue between 202A Street and 205 Street, June 27 to August 29 Trail closure: Carvolth Pond Trail, June 26, 2025. Traffic impact: 80 Avenue between 204 Street and 212 Street, June 23 to January 31 Traffic impact: 204 Street and 80 Avenue, June 16 to July 27 Traffic impact: 208 Street between Rees Lake Road and 28 Avenue, June 16 to 27 Traffic impact: 272 Street between 29 Avenue and 30 Avenue, June 16 to 27 Traffic impact: 272 Street between 32 Avenue and Fraser Highway, June 9 to July 31 Monday, June 16 to Sunday, June 22, 2025Traffic impact: 204 Street and 80 Avenue, June 16 to July 27 Traffic impact: 208 Street between Rees Lake Road and 28 Avenue, June 16 to 27 Traffic impact: 216 Street between 52 Avenue and 56 Avenue, June 16 to 20 Traffic impact: 272 Street between 29 Avenue and 30 Avenue, June 16 to 27 Traffic Impact: Glover Road between University Drive and Highway 10, June 12 to 20 Traffic impact: 80 Avenue between 206 Street and 208 Street, June 12 to 20 Traffic impact: 272 Street between 32 Avenue and Fraser Highway, June 9 to July 31 Monday, June 9 to Sunday, June 15, 2025Traffic impact: Lane closures on 56 Avenue and 264 Street, June 13 to 16 Traffic Impact: Glover Road between University Drive and Highway 10, June 12 to 20 Traffic impact: 80 Avenue between 206 Street and 208 Street, June 12 to 20 Traffic impact: 272 Street between 32 Avenue and Fraser Highway, June 9 to July 31 Traffic impact: 272 Street between 28A Avenue and 29 Avenue, June 3 to July 15 |